A senior official for the maker of the blowout preventer that failed to stop last year’s oil spill in the Gulf of Mexico says the device hadn’t been tested to see if it could cut through a bent drill pipe. The firm hired by the federal government to examine the 300-ton device after it was raised from the seafloor concluded the blind shear rams couldn’t pinch the well shut by cutting through the drill pipe. That’s because the pipe had been knocked off-center. The firm faulted the design of the Cameron-made blowout preventer. Cameron Vice President David McWhorter told a federal investigative panel today he couldn’t say whether the device was designed to cut through a bent drill pipe. McWhorter says it wasn’t tested for that possibility before the disaster.
Fed board questions Gulf fail-safe device’s design
Sign up for the free Daily Report email – local news about the people, companies and issues that impact business impact business in Baton Rouge and beyond.
