The East Baton Rouge Parish Library System is shifting gears a bit in its search to find a site for a long-planned south branch.
Library Director Spencer Watts says the system still is actively searching for a neighborhood library site. However, the Library Board of Control has asked Sperry Van Ness | Graham, Langlois & Legendre LLC, the firm handling the search, to expand its parameters to include a site that has a smaller footprint or an existing commercial site that can be retrofitted to fit the library’s needs, Watts says.
Mary Stein, assistant library director, says while officials are still looking for enough space to house a neighborhood library similar to the Fairwood Branch Library, they are now open to the possibility that the best option may be a multi-story building.
“Such a site might allow for a first floor footprint of about 5,000 square feet, but we still need a big enough parcel to support a parking lot (of) a larger size,” Stein says. “Therefore, the footprint alone doesn’t completely dictate lot size. The library probably still will need at least 1.75 or 2 acres.”
The East Baton Rouge Parish Library System has been trying for years to build a new south branch. The branch was originally set to be located in developer Tommy Spinosa’s Rouzan traditional neighborhood development, which is located at the corner of Perkins Road and Glasgow Avenue, but the board canceled its contract with Spinosa in 2013 after failing to come to terms with the developer on certain provisions in the contract.
The library board then spent nearly $10,000 on a site-selection firm, but Watts has said none of the sites, most of which were located around Burbank and Nicholson Drives, identified were a good fit for the proposed branch. The library system last year hired Sperry Van Ness | Graham, Langlois & Legendre, LLC, to help with the search.
—Ryan Broussard
