Contractor says Spinosa’s bond will cover Rouzan library infrastructure costs

    Insider

    The contractor hired by developer Tommy Spinosa to build the infrastructure needed to begin construction on the library included in the plan for the Rouzan development says the $209,000 performance bo…


    Already an INSIDER? .