Long Farm Village developer begins design work on final residential phase

(iStock)

Developer Russel Mosely is nearing the completion of residential lots in the fourth filing of his Long Farm Village and is beginning the engineering and design work on the fifth and final phase.


Already an INSIDER? Sign in.