Library system to front $2.75M for repairs to idle downtown branch

The East Baton Rouge Parish Library System will front the nearly $2.75 million needed to resume construction on the stalled River Center Branch Library downtown—provided the Metro Council approves t…


Already an INSIDER? Sign in.