Baton Rouge Interstate 10 widening assessment delayed

Though a final draft of the environmental assessment report detailing the proposed Interstate 10 widening through Baton Rouge was originally scheduled to be presented at a public hearing this month, s…


Already an INSIDER? Sign in.