Work underway on first LNG train for Woodside’s $17.5B Louisiana terminal By Holly Duchmann - September 18, 2025 FacebookTwitterLinkedinEmailPrint Woodside Energy says work on the first liquefied natural gas train at its $17.5 billion LNG terminal in Calcasieu Parish is 20% complete, Energy Tech reports. With 900 workers on site, the pr… Already an INSIDER? Sign in.